Hot Product
banner

featured

China OEM Three phase electric meter Factory – HYW-12 First And Second Ring Cage – Holley



Product Detail

Product Tags

As a way to present you with ease and enlarge our enterprise, we also have inspectors in QC Workforce and assure you our greatest support and solution for Meter box, DSSD536, GPRS module, We are looking forward to cooperating with all customers from at home and abroad. Moreover, customer satisfaction is our eternal pursuit.
China OEM Three phase electric meter Factory –HYW-12 First And Second Ring Cage – HolleyDetail:

Product Usage

According to the requirements of State Grid Corporation’s “Typical Design of Distribution Primary and Secondary Complete Equipment”, it consists of loop-in and loop-out units, feeder units, busbar equipment (PT) units and centralized DTU units,And integrated with electronic current sensor and line loss collection terminal. The DTU unit realizes functions such as three-temperature, cable measurement, short-circuit/ground fault handling, communication, and secondary power supply, and can realize the ”adaptive comprehensive in-situ automation” function.
It is suitable for power distribution in small secondary distribution stations, communities, enterprises, railways and other power systems.

Unit definition

Unit codesignificance
CStandard single casing load switch unit
FLoad switch -fuse combination unit
VCircuit breaker unit
DCable entry unit (without switch)
+Busbar side casing
-Busbar top casing
SLBuscouple unit
MMetering unit
PTPT unit
1K2(4)Load switch unit with double casing outlet

Product features

Operation safety:
We can provide users with special security through the following security measures:
Integrated three-station load switch
Circuit breaker adopts load switch instead of isolation switch, which is more safe and reliable ,The fully sealed design on the primary side provides protection against accidental contact, mechanical interlocking that meets the requirements of five-proof, and the live display can provide access to the line, and the live indication is reliable; Full airtight design, all 10kV switches and bus electrified bodies are sealed in 3mm stainless steel welded air box; It is equipped with a silicone rubber cable plug to achieve full insulation
and sealing of the cable head, so the spring energy storage operation mechanism will not be affected by the external environment such as ash layer, moisture, small animals, etc. The panel can be operated manually or electrically. The analog line diagram provides the switch position, and the indication cabinet is made of galvanized plate. The surface is electrostatically sprayed to enhance the anti-corrosion performance. The pressure gauge monitors the safe pressure range of SF6 gas in the box.

Economical:
Maintenance-free, highly reliable and service life up to 20 years


Product detail pictures:

China OEM Three phase electric meter Factory –HYW-12 First And Second Ring Cage – Holley detail pictures


Related Product Guide:

We constantly function like a tangible group to ensure that we can give you the very best high-quality and also the very best cost forChina OEM Three phase electric meter Factory –HYW-12 First And Second Ring Cage – Holley, The product will supply to all over the world, such as: Azerbaijan, Kenya, Jamaica, We warmly welcome domestic and overseas customers to visit our company and have business talk. Our company always insists on the principle of "good quality, reasonable price, the first-class service". We are willing to build long-term, friendly and mutually beneficial cooperation with you.

Leave Your Message
vr